BloomWolf™
Treating a bloom after it starts means the damage is already done. BloomWolf binds phosphorus at the source — so the bloom never starts.
The trade-off ends here.
Blooms start with nutrients. BloomWolf binds dissolved phosphorus at 5–15 mg/L before the algae can metabolize it — stopping the bloom at its source instead of treating it after the fact. Safe across the full municipal pH range with no adjustment. Tested by the University of Florida.
Prevent, don't react
25–45% phosphorus reduction across pH 5–8. Works in reservoirs, retention ponds, and stormwater systems alike.
5, 10, 15 mg/L tested
Dose-response validated at three total-product concentrations. Effect documented across the full range.
1,600× – 5,000× below no-effect level
48-hour Daphnia magna acute toxicity testing. No effect observed up to 2.5% v/v (~25,000 mg/L); threshold lies between 2.5% and 5% v/v. EPA 25(b) minimum-risk framework.
Validated. Not claimed.
Efficacy is measured by labs you'd take seriously — University of Florida, Eurofins, Product Safety Labs, Dell Tech. Raw data is available for qualified technical reviewers on request.
From problem to pilot. Three steps.
If you're still reacting to blooms instead of preventing them, and your phosphorus loading is above reservoir limits — piloting BloomWolf is the right decision.Here's how the engagement runs.
Scope a 30-minute call
Tell us about the trade-off you're trying to end in your operation. We reply within two business days.
Pilot design
A Bioferment scientist maps applicable research, selects the right product, and ships samples from Sanford within five days.
On-site integration
The team stays on the pilot until the product is integrated into your operation. Sourcing and regulatory questions answered by the people who built the formula.
What happens if you don't move.
Every reactive treatment is a bloom that already cost you something — dead fish, taste complaints, a public notice. The water authorities that go upstream on phosphorus first will be the case studies everyone else points to in 2028.
The rest of the platform.
Ready for a pilot?
If you're still reacting to blooms instead of preventing them, and your phosphorus loading is above reservoir limits — piloting BloomWolf is the right decision.
The team partners on your pilot, works through sourcing and regulatory questions, and stays involved until the product is integrated into your operation.